To the central content area

Project of Auditing & Certification Group on Regulated Recyclable Waste (Waste Tires)

Absrtact
For the auditing and certification of waste tires recycling facilities, the main tasks included the auditing processes like collection quantity, recycling quantity, operational processes, environment and accounting. According to the results of auditing and certification from January 1, 2013 to Dec. 31, 2014, the auditing and certification quantity of waste tires(general types)was 224,064,456 kg, the auditing and certification quantity of waste tires(special types)was 17,852 pieces. The total number of the field auditing for recycling facilities was 9,754 trips. For the results of the auditing training, every new inspector was required to complete at least 40-hours training and related examinations. The professional trainings were completed on March 16~17, 2013 and February 28~ March 1, 2014. According to the results of operational processes auditing for recycling facilities, the major abnormal events were disqualified storage conditions which contributed 67.23% of the total. For the results of environmental safety and health auditing, the major abnormal events were disqualified plant environment which contributed 55% of the total. The major abnormal events happened in waste tires recycling facilities were mainly the malfunctions of auditing and certification equipment, for instance, the electrical scaling and the weighting equipment malfunctions during the stock feeding/changing the printing paper, the truck weighting equipment malfunctions, and the closed-circuit television system malfunctions. There were total 214 major abnormal events which contributed 95.96% of the project’s total major abnormal events. In the other hand, the minor abnormal events were mainly the machinery malfunctions. There were total 111 minor abnormal events which accounted for 54.95% of the project’s total minor abnormal events. The accounting auditing for the recycling facilities showed no major abnormal events. During the project period, foundation of Taiwan industry service carried out 6 field inspections for the application of a newly set up recycling facility. The scoring penalty for the recycling facilities was counted total 105 points. The major causes for the scoring penalty were the violations of operational processes.
Keyword
Waste tires、The inspection and certification third party、Results of auditing and certification
Open
top